We just completed a 2 bathroom remodel for a client. The remodel required the removal of a soffit over the tub/shower units and the vanities. Both bathrooms needed the ceilings replaced due to the removal of the soffits. In the main bathroom we installed a new shower base, shower walls and a niche. The hall bath had a new tub installed along with all the other upgrades. We also replaced the toilets,vanities faucets and mirrors. We installed new floors in each bathroom as well. The client was very happy with how the project turned out.
